If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved. Applies to Cranes, Derricks, Hoists and Power-Operated equipment that can be used to hoist, lower and/or horizontally move a suspended load (includes excavators, forklifts, Rough Terrain equipment, etc., when used with rigging).You should never deviate or vary from the approved lifting plan. However, previous planning approaches are still impractical because the.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |